CONTENT PREVIEW
Airports

New York PSC approves JFK solar power project

25 January 2019

The New York State Public Service Commission (PSC) has approved a request from the Port Authority of New York and New Jersey (PANYNJ) to proceed with renewable solar power projects at JFK International Airport.

The PANYNJ, in collaboration with New York Power Authority (NYPA), will create more than 10 MW of on-site solar facilities at JFK, including a 5 MW solar generation facility that will offer power at reduced rates to nearby communities.

Residents, particularly those in low-income neighbourhoods, would have first access to purchase solar-generated renewable energy at a reduced rate from their normal utility bill.

Want to read more? For analysis on this article and access to all our insight content, please enquire about our subscription options at ihs.com/contact



(121 of 139 words)

RELEVANT PROFILE LISTINGS

  • POITIERS BIARD

    PIS/LFBI AIRFIELD REF PT.: N46 35.15 E000 18.24 ELEVATION : 423' 129m CFR : 5 MAX RWY LENGTH : 7,710' 2,350 m General Information SURFACE : Rwy 03/21, 7,710' 2,350 m, width 148' 45 m, asphalt, PCN 44 F/C/W/T. ADDITIONAL RUNWAYS : Rwy 03R/21L, 2,297' 700 m, width 148' 60 m, grass, Rwy 03L/21R,

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT