ATC

Aireon ‘weeks away’ from going live

08 February 2019

Aireon has reported it is close to reaching full operational status for its eponymous space-based ADS-B system after it formally took control of the final hosted payloads on Iridium NEXT satellites on 7 February.

“Now that we have full control over every ADS-B payload in orbit, we are just weeks away from going live with the Aireon system,” said Dennis Diekelman, Aireon senior director of programme management.

A testing and validation stage of the real-time ADS-B system will be followed in late February by performance verification (calibration for optimal performance), and Aireon is optimistic that final system acceptance will begin around 1 March, ahead of North Atlantic operational trials with Nav Canada and NATS later that month.

Want to read more? For analysis on this article and access to all our insight content, please enquire about our subscription options at ihs.com/contact

To contact the author of this article, email Ben.Vogel@ihsmarkit.com


(141 words)

RELEVANT PROFILE LISTINGS

  • POITIERS BIARD

    PIS/LFBI AIRFIELD REF PT.: N46 35.15 E000 18.24 ELEVATION : 423' 129m CFR : 5 MAX RWY LENGTH : 7,710' 2,350 m General Information SURFACE : Rwy 03/21, 7,710' 2,350 m, width 148' 45 m, asphalt, PCN 44 F/C/W/T. ADDITIONAL RUNWAYS : Rwy 03R/21L, 2,297' 700 m, width 148' 60 m, grass, Rwy 03L/21R,

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT